Skip to main content

SYS-DDQ611-03 Pre-switch check of Metering Point Characteristics, specify post code and meter number

Test IDSYS-DDQ611-03
BRS's

BRS-NO-611

Roles

DDQ

Preconditions

Metering point should have metering point status E22 (active) in Elhub

Only post code and meter number should be filled out

Postconditions

Massage containing only the specified data have been received

Optional/Mandatory

Mandatory
Test stepsExpected Result

1. Send BRS-NO-611

  • Message: RequestUpfrontMeteringPointCharacteristics
  • Document type: E10
Request is successfully sent

2. Receive ResponseUpFrontMeteringPointCharacteristics to DDQ

  • Document type: E07
ResponseUpFrontMeteringPointCharacteristics s received to DDQ



JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.