SYS-DDQ611-01 Pre-switch check of Metering Point Characteristics
Test ID | SYS-DDQ611-01 |
BRS's | BRS-NO-611 |
Roles | DDQ |
Preconditions | Metering point should have metering point status E22 (active) in Elhub Only End User ID, StreetName, BuildingNumber and PostCode should be filled out |
Postconditions | |
Optional/Mandatory | Mandatory |
Test steps | Expected Result |
1. Send BRS-NO-611
| Request is successfully sent |
2. Receive ResponsepfrontMeteringPointCharacteristics to DDQ
| ResponseUpFrontMeteringPointCharacteristics is received to DDQ |