Skip to main content

SYS-DDQ332-01 Withdraw metering values for profiled metering points

Test IDSYS-DDQ332-01
BRS's

BRS-NO-103

BRS-NO-332

Roles

DDQ

DDE

Preconditions

Metering point should have metering point status E22 (active) and be profiled

Postconditions

The metering values are withdrawn and replaced

Optional/Mandatory

Mandatory
Test stepsExpected Result

1. Send BRS-NO-103 to Elhub

  • Message: RequestStartOfSupply
  • Document type: 392
Request is successfully sent

2. Receive ConfirmStartOfSupply to DDQ (optional)

  • Document type: 294
ConfirmStartOfSupply is received to DDQ

3. Receive NotifyStartOfSupply to DDQ

  • Document type: 414
NotifyStartOfSupply is received to DDQ

4. DDE sends BRS-NO-312 to Elhub

  • The Ediel portal is operating as Grid Access Provider
 Request is successfully sent from the Ediel portal to Elhub

5. Receive NotifyValidatedDataForBillingEnergy to DDQ

  • Document type: E65
NotifyValidatedDataForBillingEnergy is received to DDQ

4. DDE sends BRS-NO-332 to Elhub

  • The Ediel portal is operating as Grid Access Provider
 Request is successfully sent from the Ediel portal to Elhub

5. Receive NotifyValidatedDataForBillingEnergy to DDQ

  • Document type: E65
NotifyValidatedDataForBillingEnergy is received to DDQ



JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.