Skip to main content

SYS-DDQ317-01 Update estimated annual consumption

Test IDSYS-DDQ317-01
DescriptionUpdate estimated annual consumption
BRS's

BRS-NO-103

BRS-NO-317

Roles

DDQ

DDM

Preconditions

Metering point should have metering point status E22 (active) in Elhub

Metering point should be profiled

Postconditions

Estimated annual consumption is updated on the metering point

Optional/Mandatory

Mandatory
Test stepsExpected Result

1. Send BRS-NO-103 to Elhub

  • Message: RequestStartOfSupply
  • Document type: 392
Request is successfully sent

2. Receive ConfirmStartOfSupply to DDQ (optional)

  • Document type: 414
ConfirmStartOfSupply is received to DDQ

3. Receive NotifyStartOfSupply to DDQ

  • Document type: 414
NotifyStartOfSupply is received to DDQ

4. DDM sends BRS-NO-317 to Elhub

  • The Ediel portal is operating as Grid Access Provider
Request is successfully sent from the Ediel portal to Elhub

5. Receive NotifyMeteringPointCharacteristics to DDQ

  • Document type: E58 
 NotifyMeteringPointCharacteristics is receved to DDQ



JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.