SYS-DDQ102-05-A
This testcase use the Ediel portal as the grid owner (DDM)
If your system support both grid owner and balance supplier roles you can run testcase SYS-DDQ102-05-B instead
| Test ID | SYS-DDQ102-05-A |
| Description | Send a move in on an inactive metering point with StartOfSupply on todays date |
| BRS's | BRS-NO-102, BRS-NO-122 |
| Roles | DDQ, DDM |
| Preconditions | Metering point should be consumption, non profiled and have metering point status 'Inactive' in Elhub |
| Postconditions | The metering point status is 'Active' in Elhub and a new balance supply contract is created for the metering point in DDQ's system with the correct move in date |
| Optional/Mandatory | Optional |
| Test steps | Expected Result |
| Message is successfully sent |
2. Receive ConfirmStartOfSupply to DDQ (optional)
| ConfirmStartOfSupply is received to DDQ |
3. DDM sends BRS-NO-122 with StartOfOccurrence on todays date to activate metering point
| Message is successfully sent |
4. DDQ receive NotifyStartOfSupply from Elhub
| NotifyStartOfSupply is received to DDQ |
| 5. Verify that DDQ's system is updated correctly | Metering point is active in Elhub and a new balance supply contract is created for the metering point in DDQ's system with the correct move in date |