This testcase use the Ediel portal as the grid owner (DDM)
If your system support both grid owner and balance supplier roles you can run testcase SYS-DDQ102-05-B instead

Test IDSYS-DDQ102-05-A
DescriptionSend a move in on an inactive metering point with StartOfSupply on todays date
BRS's

BRS-NO-102, BRS-NO-122

RolesDDQ, DDM
Preconditions

Metering point should be consumption, non profiled and have metering point status 'Inactive' in Elhub

Postconditions

The metering point status is 'Active' in Elhub and a new balance supply contract is created for the metering point in DDQ's system with the correct move in date

Optional/MandatoryOptional
Test stepsExpected Result
  1. DDQ sends BRS-NO-102 to Elhub with StartOfSupply
  • Message: RequestStartOfSupply
  • Document type: 392
Message is successfully sent

2. Receive ConfirmStartOfSupply to DDQ (optional)

  • Document type: 414
ConfirmStartOfSupply is received to DDQ

3. DDM sends BRS-NO-122 with StartOfOccurrence on todays date to activate metering point

  • The Ediel portal is operating as Grid Access Provider (DDM)
Message is successfully sent

4. DDQ receive NotifyStartOfSupply from Elhub

  • Document type: 414
NotifyStartOfSupply is received to DDQ
5. Verify that DDQ's system is updated correctlyMetering point is active in Elhub and a new balance supply contract is created for the metering point in DDQ's system with the correct move in date