Test IDSYS-DDM317-01
DescriptionUpdate estimated annual consumption
BRS's

BRS-NO-317

RolesDDM
Preconditions

Metering point should have metering point status E22 (active) in Elhub

Metering point should be profiled

Postconditions

The estimated annual consumption should be updated

Optional/MandatoryMandatory
Test stepsExpected Result
  1. Send BRS-NO-317 to Elhub
  • Message: RequestUpdateMasterDataMeteringPoint
  • Document type: E58
Request is successfully sent
2. Verify that DDM's system is updated correctlyThe estimated annual consumption is updated