SYS-DDM305-02 Change of Grid Access provider in MGA
| Test ID | SYS-DDM305-02 |
| Description | Receive information about change of Grid Access provider in MGA |
| BRS's | BRS-NO-305 |
| Roles | DDM |
| Preconditions | Metering points should have metering point status E22 (active) in Elhub Metering points should have active contract with new Balance supplier DDM should have grid access contract in MGA |
| Postconditions | All metering points in MGA has changed Grid Access provider |
| Optional/Mandatory | Mandatory |
| Test steps | Expected Result |
1. Elhub performs change of Grid Access provider and NotifyMeteringPointCharacteristics is sent to DDM
| NotifyMeteringPointCharacteristics is received by DDM |
| 2. Verify that DDM's system is updated correctly | All metering points in MGA has changed Grid Access provider |