SYS-DDM223-01 Rollback of deactivation of metering point
Test ID | SYS-DDM223-01 |
Description | Rollback of deactivation of metering point |
BRS's | BRS-NO-212 BRS-NO-223 |
Roles | DDM |
Preconditions | Metering point should have metering point status E22 (active) in Elhub |
Postconditions | Metering point status is still active |
Optional/Mandatory | Mandatory |
Test steps | Expected Result |
| Request is successfully sent |
2. Receive Acknowledgement to DDM (optional)
| Acknowledgement is received to DDM |
3. Send BRS-NO-223
| RequestUpdateMasterDataMeteringPoint is received to Elhub |
4. Receive Acknowledgement to DDM (optional)
| Acknowledgementis received to DDM |
5. Verify that DDM's system is updated correctly | The BRS-NO-212 is rolled back and the metering point status is still active |