Skip to main content

SYS-DDM222-01 Rollback of move out from metering point - from grid owner

Test IDSYS-DDM222-01
DescriptionRollback of move out from metering point - from grid owner
BRS's

BRS-NO-211

BRS-NO-222

RolesDDM
Preconditions

Metering point should have metering point status E22 (active) in Elhub 

Metering point should have an active balance supply contract

Postconditions

The balance supply contract have been reopened

Optional/MandatoryMandatory
Test stepsExpected Result
  1. Send BRS-NO-211 to Elhub
  • Message: RequestEndOfSupply
  • Document type: 432
Request is successfully sent

2. Receive ConfirmEndOfSupply to DDM (optional)

  • Document type: 406
ConfirmEndOfSupply is received to DDM

3. Send BRS-NO-222

  • Message: RequestEndOfSupply
  • Document type: E02
RequestEndOfSupply is received to Elhub

4. Receive ConfirmEndOfSupply to DDM (optional)

  • Document type: E02
ConfirmEndOfSupply is received to DDM

5. Receive NotifyStartOfSupply to DDM

  • Document type: 414
NotifyStartOfSupply is received to DDM
6. Verify that DDM's system is updated correctlyThe BRS-NO-211 is rolled back and the balance supply contract have been reopened

 

 

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.