SYS-DDM222-01 Rollback of move out from metering point - from grid owner Test IDSYS-DDM222-01DescriptionRollback of move out from metering point - from grid ownerBRS'sBRS-NO-211BRS-NO-222RolesDDMPreconditionsMetering point should have metering point status E22 (active) in Elhub Metering point should have an active balance supply contractPostconditionsThe balance supply contract have been reopenedOptional/MandatoryMandatoryTest stepsExpected ResultSend BRS-NO-211 to ElhubMessage: RequestEndOfSupplyDocument type: 432Request is successfully sent2. Receive ConfirmEndOfSupply to DDM (optional)Document type: 406ConfirmEndOfSupply is received to DDM3. Send BRS-NO-222Message: RequestEndOfSupplyDocument type: E02RequestEndOfSupply is received to Elhub4. Receive ConfirmEndOfSupply to DDM (optional)Document type: E02ConfirmEndOfSupply is received to DDM5. Receive NotifyStartOfSupply to DDMDocument type: 414NotifyStartOfSupply is received to DDM6. Verify that DDM's system is updated correctlyThe BRS-NO-211 is rolled back and the balance supply contract have been reopened ×