SYS-DDM212-01 Deactivation of metering point
Test ID | SYS-DDM212-01 |
Description | Deactivation of metering point |
BRS's | BRS-NO-212 |
Roles | DDM |
Preconditions | Metering point should have metering point status E22 (active) in Elhub Metering point should not have active contract with Grid Access Provider |
Postconditions | Metering point should have metering point status E23 (inactive) in Elhub |
Optional/Mandatory | Mandatory |
Test steps | Expected Result |
| Request is successfully sent |
2. Receive Acknowledgement to DDM (optional)
| Acknowledgement is received to DDM |
3. Verify that DDM's system is updated correctly | Metering point should should be marked as inactive |