Skip to main content

SYS-DDM211-02 Cancellation of move out from Grid Access Provider

Test IDSYS-DDM211-02
DescriptionCancellation of move out from Grid Access Provider
BRS's

BRS-NO-211

RolesDDM
Preconditions

Metering point should have metering point status E22 (active) in Elhub

Metering point should have active contract with Grid Access Provider

Postconditions

The Grid Access contract on the metering point has not been changed

Optional/MandatoryMandatory
Test stepsExpected Result
  1. Send BRS-NO-211 to Elhub
  • Message: RequestEndOfSupply
  • Document type: 432
Request is successfully sent

2. Receive ConfirmEndOfSupply to DDM (optional)

  • Document type: 406
ConfirmEndOfSupply is received to DDM

3. Send BRS-NO-211 to Elhub

  • Message: RequestEndOfSupply
  • Document type: E02
 Request is successfully sent

4. Receive ConfirmEndOfSupply to DDM (optional)

  • Document type: E02
ConfirmEndOfSupply is received to DDM
5. Verify that DDM's system is updated correctly

The BRS-NO-211 is cancelled and the Grid Access contract on the metering point

has not been changed

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.