SYS-DDM211-02 Cancellation of move out from Grid Access Provider Test IDSYS-DDM211-02DescriptionCancellation of move out from Grid Access ProviderBRS'sBRS-NO-211RolesDDMPreconditionsMetering point should have metering point status E22 (active) in ElhubMetering point should have active contract with Grid Access ProviderPostconditionsThe Grid Access contract on the metering point has not been changedOptional/MandatoryMandatoryTest stepsExpected ResultSend BRS-NO-211 to ElhubMessage: RequestEndOfSupplyDocument type: 432Request is successfully sent2. Receive ConfirmEndOfSupply to DDM (optional)Document type: 406ConfirmEndOfSupply is received to DDM3. Send BRS-NO-211 to ElhubMessage: RequestEndOfSupplyDocument type: E02 Request is successfully sent4. Receive ConfirmEndOfSupply to DDM (optional)Document type: E02ConfirmEndOfSupply is received to DDM5. Verify that DDM's system is updated correctlyThe BRS-NO-211 is cancelled and the Grid Access contract on the metering point has not been changed ×