SYS-DDM133-01 Rollback of move in on metering point
Test ID | SYS-DDM133-01 |
Description | Rollback of move in on metering point |
BRS's | BRS-NO-123 BRS-NO-133 |
Roles | DDM |
Preconditions | Metering point should have metering point status E22 (active) in Elhub Metering point should have an active grid access contract with end user |
Postconditions | The contract created by BRS-NO-123 is rolled back The previous contract has been reopened |
Optional/Mandatory | Mandatory |
Test steps | Expected Result |
| Request is successfully sent |
2. Receive ConfirmStartOfSupply to DDM (optional)
| ConfirmStartOfSupply is received to DDM |
3. Receive NotifyStartOfSupply to DDM
| NotifyStartOfSupply is received to DDM |
4. Send BRS-NO-133 to Elhub
| Request is successfully sent |
5. Receive ConfirmStartOfSupply to DDM (optional)
| ConfirmStartOfSupply is received to DDM |
6. Receive NotifyStartOfSupply to DDM
| NotifyStartOfSupply is received to DDM |
7. Verify that DDM's system is updated correctly | The contract created by BRS-NO-123 is rolled back and the previous contract has been reopened |