Test IDSYS-DDM123-02
DescriptionCreate, activate and move in on a profiled, consumption metering point
BRS's

BRS-NO-121
BRS-NO-122
BRS-NO-123

RolesDDM
PreconditionsMetering point must not exist in Elhub 
Postconditions

A profiled, comsumption metering point must be created and activated
Metering points must have active contract with Supplier of last resort

Optional/MandatoryMandatory
Test stepsExpected Result
  1. Send BRS-NO-121 til Elhub
  • Message: RequestUpdateMasterDataMeteringPoint
  • Document type: E58
Request is successfully sent
2. Receive positive acknowledgement to DDM (optional)
  • Document type: 294
Positive Acknowledgement is received to DDM

3. Send BRS-NO-122 to Elhub

  • Message: RequestUpdateMasterDataMeteringPoint
  • Document type: E58
Request is successfully sent

4. Receive positive acknowledgement to DDM (optional)

  • Document type: 294
Positive Acknowledgement is received to DDM

5. Send BRS-NO-123 to Elhub

  • Message: RequestStartOfSupply
  • Document type: 392
Request is successfully sent

6. Receive ConfirmStartOfSupply to DDM (optional)

  • Document type: 414
ConfirmStartOfSupply is received to DDM

7. Receive NotifyStartOfSupply to DDM

  • Document type: 414
NotifyStartOfSupply is received by DDM
8. Verify that DDM's system is updated correctly

Metering pont is created and activated and has an active contract with

Supplier of last resort