Test IDSYS-DDM121-01
DescriptionCreate a non-profiled combined metering point
BRS's

BRS-NO-121

RolesDDM
PreconditionsMetering point must not exist in Elhub 
Postconditions

A non-profiled, combined metering point is created

Optional/MandatoryMandatory
Test stepsExpected Result
  1. Send BRS-NO-121 til Elhub
  • Message: RequestUpdateMasterDataMeteringPoint
  • Document type: E58
Request is successfully sent

2. Receive positive acknowledgement to DDM (optional)

  • Document type: 294
Positive Acknowledgement is received to DDM

3. Verify that DDM's system is updated correctly

Metering pont is created but not activated