SYS-DDM111-03 Receive information about Rollback move in back in time
Test ID | SYS-DDM111-03 |
Description | Receive information about rollback of move in back in time from DDQ |
BRS's | BRS-NO-103 BRS-NO-111 |
Roles | DDM, DDQ |
Preconditions | Metering point should have metering point status E23 (inactive) in Elhub |
Postconditions | The initiating balance supplier does not have an active contract on the metering point |
Optional/Mandatory | Mandatory |
Test steps | Expected Result |
1. DDQ sends BRS-NO-103 to Elhub
| Request is successfully sent from Ediel portal to Elhub |
2. DDM receives NotifyStartOfSupply from Elhub
| NotifyStartOfSupply is successfully received by DDM |
3. DDQ sends BRS-NO-111 til Elhub
| Request is successfully sent from Ediel portal to Elhub |
4. DDM receives NotifyStartOfSupply from Elhub
| NotifyStartOfSupply is successfully received by DDM |
5. Verify that DDM's system is updated correctly | The move in is reversed and the initiating Balance supplier does not have an active contract on the metering point |