Skip to main content

SYS-DDM111-02 Receive information about Rollback move in

Test IDSYS-DDM111-02
DescriptionReceive information about rollback of move in from DDQ
BRS's

BRS-NO-102

BRS-NO-111

RolesDDM, DDQ
Preconditions

Metering point should have metering point status E22 (active) in Elhub

Postconditions

The initiating balance supplier does not have an active contract on the metering point

Optional/MandatoryMandatory
Test stepsExpected Result

1. DDQ sends BRS-NO-102 to Elhub

    • The Ediel portal is operating as Balance supplier
Request is successfully sent from the Ediel portal to Elhub 

2. DDM receives NotifyStartOfSupply from Elhub

  • Document type: 414
NotifyStartOfSupply is successfully received by DDM

3. DDQ sends BRS-NO-111 til Elhub

    • The Ediel portal is operating as Balance supplier
Request is successfully sent from the Ediel portal to Elhub after cancellation deadline

4. DDM receives NotifyStartOfSupply from Elhub

  • Document type: E02
NotifyStartOfSupply is successfully received by DDM

5. DDM receives NotifyStartOfSupply from Elhub

  • Document type: 414
NotifyStartOfSupply is successfully received by DDM
6. Verify that DDM's system is updated correctly

The move in is reversed and the initiating Balance supplier does not have an

active contract on the metering point



JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.