SYS-DDM111-01 Receive information about Rollback start of supply Test IDSYS-DDM111-01DescriptionReceive information about rollback start of supply from DDQBRS'sBRS-NO-101BRS-NO-111RolesDDM, DDQPreconditionsMetering point should have metering point status E22 (active) in ElhubPostconditionsThe initiating balance supplier does not have an active contract on the metering pointOptional/MandatoryMandatoryTest stepsExpected ResultDDQ sends BRS-NO-103 to ElhubThe Ediel portal is operating as Balance supplierMessage: RequestStartOfSupplyDocument type: 392Request is successfully sent from the Ediel portal to Elhub 2. Elhub confirms Move inStep 2 is approved3. DDQ sends BRS-NO-101 to ElhubThe Ediel portal is operating as Balance supplierRequest is successfully sent from the Ediel portal to Elhub 4. DDM receives NotifyStartOfSupply from ElhubDocument type: 414NotifyStartOfSupply is successfully received by DDM5. DDQ sends BRS-NO-111 til ElhubThe Ediel portal is operating as Balance supplierRequest is successfully sent from the Ediel portal to Elhub 6. DDM receives NotifyStartOfSupply from ElhubDocument type: E02NotifyStartOfSupply is successfully received by DDM7. Verify that DDM's system is updated correctlyThe change of supplier is reversed and the initiating Balance supplier does not have an active contract on the metering point ×