Skip to main content

SYS-DDM111-01 Receive information about Rollback start of supply

Test IDSYS-DDM111-01
DescriptionReceive information about rollback start of supply from DDQ
BRS's

BRS-NO-101

BRS-NO-111

RolesDDM, DDQ
Preconditions

Metering point should have metering point status E22 (active) in Elhub

Postconditions

The initiating balance supplier does not have an active contract on the metering point

Optional/MandatoryMandatory
Test stepsExpected Result
  1. DDQ sends BRS-NO-103 to Elhub
  • The Ediel portal is operating as Balance supplier
    • Message: RequestStartOfSupply
    • Document type: 392
Request is successfully sent from the Ediel portal to Elhub 
2. Elhub confirms Move inStep 2 is approved

3. DDQ sends BRS-NO-101 to Elhub

    • The Ediel portal is operating as Balance supplier
Request is successfully sent from the Ediel portal to Elhub 

4. DDM receives NotifyStartOfSupply from Elhub

  • Document type: 414
NotifyStartOfSupply is successfully received by DDM

5. DDQ sends BRS-NO-111 til Elhub

    • The Ediel portal is operating as Balance supplier
Request is successfully sent from the Ediel portal to Elhub 

6. DDM receives NotifyStartOfSupply from Elhub

  • Document type: E02
NotifyStartOfSupply is successfully received by DDM
7. Verify that DDM's system is updated correctly

The change of supplier is reversed and the initiating Balance supplier

does not have an active contract on the metering point



JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.