Skip to main content

SYS-DDM104-01 Receive information about Change from Supplier of last resort

sult

Test IDSYS-DDM104-01
DescriptionReceive information about change from Supplier of last resport
BRS's

BRS-NO-123

BRS-NO-104

RolesDDQ, DDM
Preconditions

Metering point must have status active (E22) in Elhub

Postconditions

A change of supplier is done for the metering point in DDM's system

Optional/MandatoryMandatory
Test stepsExpected Result
  1. Send BRS-NO-123 to Elhub with move in
  • Message: RequestStartOfSupply
  • Document type: 392
Request is successfully sent from DDM to Elhub 
2. Receive positive acknowledgement to DDM (optional)
  • Document type: 294
Positive Acknowledgement is received to DDM

3. DDQ sends BRS-NO-104 to Elhub

  • The Ediel portal is operating as Balance supplier
Request is successfully sent from the Ediel portal to Elhub 
4. Elhub confirms Change of SupplierStep 4 is approved

5. Receive NotifyStartOfSupply to DDM

  • Document type: 414
NotifyStartOfSupply is received by DDM

6. Verify that DDM's system is updated correctly

Change of supplier is done back in time for the metering point




JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.