sult

Test IDSYS-DDM104-01
DescriptionReceive information about change from Supplier of last resport
BRS's

BRS-NO-123

BRS-NO-104

RolesDDQ, DDM
Preconditions

Metering point must have status active (E22) in Elhub

Postconditions

A change of supplier is done for the metering point in DDM's system

Optional/MandatoryMandatory
Test stepsExpected Result
  1. Send BRS-NO-123 to Elhub with move in
  • Message: RequestStartOfSupply
  • Document type: 392
Request is successfully sent from DDM to Elhub 
2. Receive positive acknowledgement to DDM (optional)
  • Document type: 294
Positive Acknowledgement is received to DDM

3. DDQ sends BRS-NO-104 to Elhub

  • The Ediel portal is operating as Balance supplier
Request is successfully sent from the Ediel portal to Elhub 
4. Elhub confirms Change of SupplierStep 4 is approved

5. Receive NotifyStartOfSupply to DDM

  • Document type: 414
NotifyStartOfSupply is received by DDM

6. Verify that DDM's system is updated correctly

Change of supplier is done back in time for the metering point