SYS-DDM104-01 Receive information about Change from Supplier of last resort
sult
Test ID | SYS-DDM104-01 |
Description | Receive information about change from Supplier of last resport |
BRS's | BRS-NO-123 BRS-NO-104 |
Roles | DDQ, DDM |
Preconditions | Metering point must have status active (E22) in Elhub |
Postconditions | A change of supplier is done for the metering point in DDM's system |
Optional/Mandatory | Mandatory |
Test steps | Expected Result |
| Request is successfully sent from DDM to Elhub |
2. Receive positive acknowledgement to DDM (optional)
| Positive Acknowledgement is received to DDM |
3. DDQ sends BRS-NO-104 to Elhub
| Request is successfully sent from the Ediel portal to Elhub |
4. Elhub confirms Change of Supplier | Step 4 is approved |
5. Receive NotifyStartOfSupply to DDM
| NotifyStartOfSupply is received by DDM |
6. Verify that DDM's system is updated correctly | Change of supplier is done back in time for the metering point |