SYS-AG313-02 Receive metering values for non-profiled metering point
| Test ID | SYS-AG313-02 |
| Description | Receive metering values for non-profiled metering point |
| BRS's | BRS-NO-622 BRS-NO-313 |
| Roles | AG DDE |
| Preconditions | The metering point must be non-profiled The metering point must have a balance supply contract with an end user |
| Postconditions | The requested metering values have been received from Elhub and are visible in DDQ's system. Message contains timestamps for registration date time and insert time |
Optional/Mandatory | Mandatory |
| Test steps | Expected Result |
1. Send BRS-NO-622 to Elhub | Request is successfully sent |
2. Receive Acknowledgement
| Positive Acknowledgement is received to AG |
| 3. End user accepts the access request. This is done manually by Elhub and could take a couple of days | Access request for the metering point is accepted by the end user |
| 4. Ediel portal operates as DDE and sends meter values for the metering point to Elhub | Metering values are sent by Ediel to Elhub |
| 5. Receive BRS-NO-313 to AG | BRS-NO-313 is received to AG |
| 6. Verify that AG's system is updated correctly | Meter reads are stored and are visible for AG |