Test IDSYS-DDQ611-03
BRS's

BRS-NO-611

Roles

DDQ

Preconditions

Metering point should have metering point status E22 (active) in Elhub

Only post code and meter number should be filled out

Postconditions

Massage containing only the specified data have been received

Optional/Mandatory

Mandatory
Test stepsExpected Result

1. Send BRS-NO-611

  • Message: RequestUpfrontMeteringPointCharacteristics
  • Document type: E10
Request is successfully sent

2. Receive ResponseUpFrontMeteringPointCharacteristics to DDQ

  • Document type: E07
ResponseUpFrontMeteringPointCharacteristics s received to DDQ