SYS-DDQ611-01 Pre-switch check of Metering Point Characteristics
| Test ID | SYS-DDQ611-01 | 
| BRS's | BRS-NO-611 | 
| Roles | DDQ | 
| Preconditions | Metering point should have metering point status E22 (active) in Elhub Only End User ID, StreetName, BuildingNumber and PostCode should be filled out | 
| Postconditions | |
| Optional/Mandatory | Mandatory | 
| Test steps | Expected Result | 
| 1. Send BRS-NO-611 
 | Request is successfully sent | 
| 2. Receive ResponsepfrontMeteringPointCharacteristics to DDQ 
 | ResponseUpFrontMeteringPointCharacteristics is received to DDQ | 
