Test ID | SYS-DDM223-01 |
Description | Rollback of removal of metering point |
BRS's | BRS-NO-213 BRS-NO-224 |
Roles | DDM |
Preconditions | Metering point should have metering point status E23 (inactive) in Elhub |
Postconditions | Metering point have changed back to Inactive |
Optional/Mandatory | Optional |
Test steps | Expected Result |
- Send BRS-NO-213 to Elhub
- Message: RequestUpdateMasterDataMeteringPoint
- Document type: E58
| Request is successfully sent |
2. Receive Acknowledgement to DDM (optional) | Acknowledgement is received to DDM |
3. Send BRS-NO-224 - Message: RequestUpdateMasterDataMeteringPoint
- Document type: E67
| Request is successfully sent |
4. Receive Acknowledgement to DDM (optional) | Acknowledgementis received to DDM |
5. Verify that DDM's system is updated correctly | The BRS-NO-213 is rolled back and the metering point have changed back to Inactive |