SYS-DDM213-01 Removal of metering point
| Test ID | SYS-DDM213-01 |
| Description | Removal of metering point |
| BRS's | BRS-NO-213 |
| Roles | DDM |
| Preconditions | Metering point should have metering point status E23 (inactive) in Elhub |
| Postconditions | Metering point should have metering point status E31 (terminated) in Elhub |
| Optional/Mandatory | Mandatory |
| Test steps | Expected Result |
| Request is successfully sent |
2. Receive Acknowledgement to DDM (optional)
| Acknowledgement is received to DDM |
| 3. Verify that DDM's system is updated correctly | Metering point should be marked as terminated |