Test IDSYS-DDM211-01
DescriptionMove out from Grid Access Provider
BRS's

BRS-NO-211

RolesDDM
Preconditions

Metering point should have metering point status E22 (active) in Elhub

Metering point should have active contract with Grid Access Provider

Postconditions

The Grid Access contract on the metering point has been ended on the change date

Optional/MandatoryMandatory
Test stepsExpected Result
  1. Send BRS-NO-211 to Elhub
  • Message: RequestEndOfSupply
  • Document type: 432
Request is successfully sent

2. Receive ConfirmEndOfSupply to DDM (optional)

  • Document type: 406
ConfirmEndOfSupply is received to DDM
3. Verify that DDM's system is updated correctlyThe Grid Access contract on the metering point is ended on the change date