SYS-DDM102-04-A
This testcase use the Ediel portal as the balance supplier (DDQ)
If your system support both grid owner and balance supplier roles you can run testcase SYS-DDM102-04-B instead
| Test ID | SYS-DDM102-04-A | 
| Description | Send a move in on an inactive metering point with StartOfSupply on todays date | 
| BRS's | BRS-NO-102 | 
| Roles | DDQ, DDM | 
| Preconditions | Metering point should be consumption, non profiled and have metering point status 'Inactive' in Elhub | 
| Postconditions | The metering point status is still 'Inactive' in Elhub and no new contract is created for the metering point in DDM's or DDQ's system | 
| Optional/Mandatory | Mandatory | 
| Test steps | Expected Result | 
| 
 
 | Request i successfully sent | 
| 2. DDM receives NotifyStartOfSupply from Elhub | NotifyStartOfSupply is received to DDM | 
| 3. DDM sends RejectStartOfSupply with error code "EH095 - Metering point cannot be activated" to Elhub | RejectStartOfSupply is successfully sent | 
| 4. Verify that DDM's system is updated correctly | Metering point is still inactive in Elhub and no new contract is created on the metering point in DDM's system | 