sult

Test IDSYS-DDM102-01
DescriptionReceive information about Move in - from Balance supplier
BRS's

BRS-NO-102

RolesDDQ, DDM
Preconditions

Metering point should have metering point status E23 (inactive) in Elhub

Postconditions

A new balance supply contract is created for the metering point in DDM's system

Optional/MandatoryMandatory
Test stepsExpected Result
  1. Send BRS-NO-122 to activate metering point
  • Message: RequestUpdateMasterDataMeteringPoint
  • Document type: E58
Message is successfully sent
2. Receive positive acknowledgement to DDM (optional)
  • Document type: 294
Positive Acknowledgement is received to DDM

3. DDQ sends BRS-NO-102 to Elhub

  • The Ediel portal is operating as Balance supplier
Request is successfully sent from the Ediel portal to Elhub 

4. Receive NotifyStartOfSupply to DDM

  • Document type: 414
NotifyStartOfSupply is received by DDM

5. Verify that DDM's system is updated correctly

A new balance supply contract is created for the metering point